Rendered before/after
I think one of their "efficiency" experts decided a belt was more efficient than a boxline. It must be cheaper to pay drivers to sort and load than a part timer.
I only saw belts instead of boxlines in smaller buildings.
We have a huge tub with three centers. We used to have box lines. They expanded our building in 2020 and got rid of all the Box signs went to straight belts.
I think one of their "efficiency" experts decided a belt was more efficient than a boxline. It must be cheaper to pay drivers to sort and load than a part timer.
I only saw belts instead of boxlines in smaller buildings.
We have a huge hub with three centers. We used to have box lines. They expanded our building in 2020 and got rid of all the Box signs went to straight belts.