System maintenance completed. Please clear your browser cache and log in again.

Building closures/openings

sweeper · 2025-11-30 15:24 · 674 views

Sagamore Massachusetts closes 1/23/2026


What happens to the feedahs?


What happens to the feedahs?

I don’t know

I heard burtonsville MD is partially closing to renovate for automation in April. Don't know where the work will go. Their day sort moved to ezrpa a while ago. If they could've moved any more of the operation over there they would've already. Company thinks it will take a couple months to reopen so it will probably take a couple years.


I heard burtonsville MD is partially closing to renovate for automation in April. Don't know where the work will go. Their day sort moved to ezrpa a while ago. If they could've moved any more of the operation over there they would've already. Company thinks it will take a couple months to reopen so it will probably take a couple years.

Ours has been on hold

The Griffin Center in Griffin GA was recently closed and the work split between Forest Park and Macon.
the building had been leased since 1976 and was pretty run down. A PT steward kept calling OSHA over unsafe working conditions and the owner of the building decided it was more trouble than it was worth and declined to renew the lease when it expired


The Griffin Center in Griffin GA was recently closed and the work split between Forest Park and Macon.
the building had been leased since 1976 and was pretty run down. A PT steward kept calling OSHA over unsafe working conditions and the owner of the building decided it was more trouble than it was worth and declined to renew the lease when it expired

The company leases the buildings from a shell corporation


The company leases the buildings from a shell corporation

This building had been leased by the same LLC since 1976. It's a crappy building, I worked in it from 1985-1988 before moving to a new building that opened in another city.

This building had been leased by the same LLC since 1976. It's a crappy building, I worked in it from 1985-1988 before moving to a new building that opened in another city.


Lots of the buildings are so called leased.


This building had been leased by the same LLC since 1976. It's a crappy building, I worked in it from 1985-1988 before moving to a new building that opened in another city.

The same reason we don't have a permanent back up generator
It's all a shell game


The same reason we don't have a permanent back up generator
It's all a shell game

The power went out at our building and they brought a generator inside a 53 foot trailer and ran the building off of it. It stayed in our yard for a long time after. Someone told me UPS owns it.


The power went out at our building and they brought a generator inside a 53 foot trailer and ran the building off of it. It stayed in our yard for a long time after. Someone told me UPS owns it.

They share ine between 4 buildings here


I'm out of a neighboring center and we were shocked when we heard last week. Especially since last year they closed the new Kingston MA center they just built 5 years ago. That center took numerous routes from Sagamore, then of course those routes went back to sagamore this year. We can't imagine the remaining centers absorbing all these routes, we are all pretty full. Peak going forward will be damn near impossible to contain.


I'm out of a neighboring center and we were shocked when we heard last week. Especially since last year they closed the new Kingston MA center they just built 5 years ago. That center took numerous routes from Sagamore, then of course those routes went back to sagamore this year. We can't imagine the remaining centers absorbing all these routes, we are all pretty full. Peak going forward will be damn near impossible to contain.

Better not bigger


The power went out at our building and they brought a generator inside a 53 foot trailer and ran the building off of it. It stayed in our yard for a long time after. Someone told me UPS owns it.

The power went out for several days at my building once. UPS needed a couple of days to find a generator because everyone else wanted them too.


The power went out for several days at my building once. UPS needed a couple of days to find a generator because everyone else wanted them too.

Our power was out for a couple days also. The preload went down again the next night cause they ran the generator out of diesel 🤣🤣 idiots


The Griffin Center in Griffin GA was recently closed and the work split between Forest Park and Macon.
the building had been leased since 1976 and was pretty run down. A PT steward kept calling OSHA over unsafe working conditions and the owner of the building decided it was more trouble than it was worth and declined to renew the lease when it expired

The part timers have struck again

Wilmington Village closes January 26.
Lotsa package routes going to be split amongst other buildings.
Lol, they recently (maybe 2 years ago) put like 6 million dollars into upgrading this building...


I don’t know

OnlyFeedahs?


Wilmington Village closes January 26.
Lotsa package routes going to be split amongst other buildings.
Lol, they recently (maybe 2 years ago) put like 6 million dollars into upgrading this building...

That's crazy

Good thing we are slowing down....

Log in to reply.